MINIMAL ENQUIRY DATA

CLIENT PROJECT     Contact:
    Project name/location:
    Purpose/use of crane:
BOOM HEELPIN ELEVATION  (to ensure hoist has suffcient pull and hook fall)             ELEV (above water): ft m elevation
STRUCTURE UPON WHICH THE CRANE IS MOUNTED       Bottom Supported Crane Base:
             such as Platform or sunken Inland Barge rig
      Floating Crane Base
            TLP or SPAR
            Semisubmersible
            Drillship or FPSO
            Ship or Barge in calm water
LIFT REQUIREMENTS
             SWLlb Kg @ RADIUSft m LIFT TYPE HOOK
             on-board off-board main aux/fly
             on-board off-board main aux/fly
             on-board off-board main aux/fly
             on-board off-board main aux/fly
             on-board off-board main aux/fly
OPERATIONAL ENVIRONMENT  (anticipated actual lift conditions, not storm or extreme conditions)             Method or Sea State: Legacy Dynamic Method or General Method with wave height (Hsig) of: ft m
            Wind Speed Kt MPH Km/hr m/s
            Low Temperature F C
DUTY CYCLE (API 2C standard categories)        Note: higher duty cycles require heavier and significantly more costly machinery.
             Production Duty (200 hr/yr @ 45% load)
            Construction (1000 hr/yr @ 55% load)
            Intermediate Duty (2000 hr/yr @45% load)
            Drilling Duty (5000 hr/yr @45% load)
  PRIME MOVER
         Diesel Engine Electric Motor @ VAC PH Hz
Fill out form, print screen and paste image into an email to info@Seacrane.us, or print form, fill out, scan and email.